Thankful… and the reason, I haven’t been posting as much…

It’s Thanksgiving Day. The day that Americans post their thoughts on things that they’re grateful for.

Two years ago, I wrote an EV Thanksgiving post focused on all the EV choices that we get in California. Since then several other models have been introduced, with the latest one being the Tesla Model X.

Another thing I can be thankful for is the safe, little EV that my mom was drving that met its untimely demise when an SUV merged into her. It did its job and protected her through the whole process and reminds me that i have to re-emerge from the cocoon I’ve been in and help her find a new EV to replace little OB-8.

I’ve been very busy lately and have started, but not finished a few blog posts that have not seen the light of day.

  • Namely a draft of my Tesla Model S 70D experience (it’s what we drove from SoCal to the Bay Area in September for the Model X Launch party.
  • A draft of my month of driving a Tesla Model S P85, P85+, P85D, and 70D in the same month.
  • and so much more… I’ll get to it… eventually.

So, loyal readers, what have I been up to?

A few months ago, I was approached and engaged by EV Connect, Inc. an EV Charging Solution provider [since I started writing this on Thanksgiving Day, I didn’t get formal approval to release my client’s name, so withheld for now] to assist them to manage and file a submission to design, construct, manage, maintain, analyze, and report on the nine electric charging highway corridors that the State of California, via the California Energy Commission (CEC), has decided to fund in its 2012 agreement with the states of Oregon and Washington, along with the province of British Columbia to create the West Coast Electric Highway. It’s been a fun three months of working in a field that I’ve grown into.

As many long-time readers can attest, I really “fell into” this industry and I really enjoy transitioning from a consumer to hopefully a professional in this field. I am thankful for that client and truly hope that we “win” the bid from the CEC for GFO 15-601 (which was due yesterday at 3pm.)

Since, I didn’t get a release from my client, I won’t give out the details of the proposal, but can at least talk about the CEC grant.  I can say that the approach we took gave due consideration to light duty electric vehicle drivers traveling these routes.  It wasn’t that long ago I was driving an 80-100 mile EV with no DCFC capability. (I miss my Active E.)

The CEC identified 9 highway corridors that are in need of additional DC Fast charging (DCFC or CHAdeMO and/or SAE-Combo/CCS.)

The corridors identified by the CEC are:

  1. I-5: Oregon Border to Red Bluff
  2. I-5: South of Red Bluff to North of Sacramento
  3. SR 99: South of Sacramento to North of Fresno
  4. SR 99: Fresno to North of Wheeler Ridge
  5. US 101: San Jose to Buellton
  6. I-5: Wheeler Ridge to Santa Clarita
  7. I-5: San Clemente to Oceanside
  8. SR 99: South of Red Bluff to North of Sacramento
  9. I-5: South of Sacramento to North of Wheeler Ridge

These nine corridors had differing distances, budgets, and preferred number of chargers to install. The first seven were required to have both CHAdeMO and CCS for the equipment to be proposed and the last two were secondary and required CHAdeMO only, though preferred a combo CHAdeMO and CCS, but the budgets were also very tight.

We had several months to find site sponsors, get equipment quotes, find construction partners, obtain additional funds, start the process to participate in the WCEH, and approach other constituents.

As a rEVolutionary, I am glad to see the expansion of the ability of light duty electric vehicles (your approx 80-100 mile range EVs in the parlance of the CEC proposal) to traverse the North-South corridors of California and eventually connect with Oregon, Washington, and beyond, but as a participant in the process, I’m biased. And hope that EV Connect, Inc. [name retracted for now, the awesome folks who hired me to work with them and get our bid in to fruition] win this bid!

I truly am happy and thankful. Hopefully by this time next year, we’re well on our way to having this DC Fast Charge network being completed to get mom in her replacement light duty electric vehicle able to fast charge from the LA Area to wherever North or South she wants to head to… ’cause my input was to ensure that folks like her can travel these distances comfortably without getting stranded… So, fingers crossed.

Happy Thanksgiving!

EV Thanks on Thanksgiving 2013… 50,000 all electric miles!


So, my favorite EV News site at transportevolved.com asked what do you have to be EV Thankful for… (Interestingly they’re based in the UK, but with a LARGE audience of the American EV Community)

After over 21 months of EV driving and meticulous postings of my electric mileage, it’s finally happened. Sometime in the past few weeks I’ve passed 50,000 all electric miles of driving!

I would have been more precise, however. Sharing EVs with my wife, I can’t tell which are her driving miles versus my driving miles. I do know that I drive 95-98% of the time, so I can claim most of the miles.

So… What does that mean… Well, I’ve calculated a cost of approximately $0.008 per mile since I’ve moved to Solar power on my roof. Well, let’s assume that with the addition of the Tesla Roadster and Model S to the fleet, my costs have gone up to $0.012 per mile. I’m using this figure because both the Roadster and Model S exhibits more Vampire Drain (defined as the energy consumed by the EV while idle) than the Active E has in its approximately 48,000 miles of service. So, using this figure, let’s say that we’ve spent approximately $600 during these 50,000 miles. Well, I’ve used paid EV Charging Networks as well. Not too often, but enough to approximate an additonal $50, let’s double this figure to be really conservative. So, we’re talking $700 for the 50,000 miles. Now, if we had driven all those miles in our least expensive ICE (Internal Combustion Engine (gasoline engine)) car was at $0.15 per mile. These same miles would have been $7,500 in energy costs.

So, I guess after 50,000 miles, I have at least $6,800 to be thankful for.

What else do I have to be EV Thankful for… Frankly, living in Southern California has given me the ability to choose amongst the widest selection of Electric and Plug-in Hybrid vehicles on the market. I’ve been lucky enough to have been able to drive this gallery of electric vehicles.

Ranging from failures like the Coda (which I reviewed early on the blog’s existence) and Fisker Karma.

Coda
IMGP6037

Fisker Karma
IMG_3943

To California Compliance limited production run EVs such as the Honda Fit EV and Fiat 500e.

Honda Fit EV
IMG_4837

Fiat 500E
IMG_2501

Is the Spark EV a compliance car or production?

Chevy Spark EV
Glendale-20130619-00008

To hand converted beauties like the ZElectricbug.

ZElectric Bug #1
IMG_1888

To full production EVs, like the Mitsubishi iMiEV, Ford Focus EV, Nissan Leaf, Smart 3rd Gen ED, and my latest temptation the BMW i3. Not pictured are the Chevy Volt, 2nd Gen Toyota RAV4 EV, and the Plug-in Prius.

Mitsubishi iMiEV
Untitled

Ford Focus EV
IMG_1236

Nissan Leaf
IMG_1583

Smart 3rd Gen ED
IMG_4745

BMW i3
IMG_5427

And of course, our EV fleet… The Tesla Roadster, Tesla Model S, and the one that got me hooked on EVs our BMW Active E.

Our Tesla Roadster
IMG_2694

Our Model S
Untitled

Our BMW ActiveE
2012-03-08_11-55-27_944

So… EVeryone in the EV world. From rEVolutionaries and those that are curious (join us, the water is fine)

Happy Thanksgiving!